Public Works
Operations
Division |
To FAQs
Overview
The Operations
Division consists of administrative personnel, work crews, and
equipment necessary to schedule and carry out the functions
of Public Works related to street and drainage maintenance and
traffic control signs and markings in the City of Little Rock.
Location
The Operations Division office is located at 3313 J. E. Davis
Dr., Little Rock, Arkansas 72209. You may contact our Service
Request Desk at 918-3600 or visit our
E-Service
web site with requests or questions. The Operations Division
fax number is 918-3670. Office hours are from 8:00 a.m. to
4:30 p.m., Monday through Friday.
Scheduling Work Requests
Scheduling personnel in the Operations Division are responsible
for taking work requests from the public, City administration,
or other divisions of Public Works. Once a work request has
been submitted, scheduling personnel link the request with
current activities and resources. The request is then given
a work order number and scheduled with an appropriate work
crew. Emergency repairs are given priority, and all other
minor repairs or maintenance activities are scheduled as soon
as available resources permit. Major repair or maintenance
requests are investigated by an Operations foreman or Scheduling
personnel to determine resources needed for the job.
Life Cycle of a Work Request
| 1. |
A
citizen notices a drainage problem and calls Operations'
Service Request Desk at 918-3600, or uses the
E-Service website. |
| 2. |
Scheduling
reviews the request, linking it with an assessment of
current activities and available resources. Civil Engineering
provides assistance if the task will involve structural
modifications or major repairs. |
| 3. |
Civil
or Traffic Engineering determine the need for major
repairs to streets and drainage facilities. Work is
scheduled when funds are available, and a work request
file is activated based on priority of the task. |
| 4. |
After
a routine request is given a work order number, the task
is given to a foreman for completion. |
| 5. |
A
letter/survey informing the customer of the timetable
for completion of the task is mailed or e-mailed to
the requestor. |
| 6. |
Crews
are sent out to perform the task. |
| 7. |
All
activities associated to the work order are entered
into the Management Information System. When the task
is completed, the MIS documents the resources used for meeting
the request of the customer. |
Street Drainage and Maintenance
Normal street and drainage maintenance activities include
street cleaning, repair, and resurfacing. Also included are
bridge repair, ditch-digging and cleaning, rights-of-way mowing
and cleaning, tree trimming and removal, and snow and
ice removal. Routine maintenance procedures and repairs are
completed with available resources.
Many major street or drainage repairs are first investigated
by Public Works Operations Division. If existing street or
drainage structures need major modification or repair, Public
Works Civil Engineering Division is contacted to investigate
and recommend project design specifics.
Included among the responsibilities of Public Works Operations
are production, installation, and repair of traffic signs.
Traffic signal repair and maintenance is provided by the Traffic
Engineering Division. Operations is responsible for all traffic
control pavement markings on City streets.
For
Traffic Signal Repair, See Traffic Engineering Division
Things
You Should Know...
- Concerns about streets or
drainage should be directed to our Service Request Desk
at 918-3600 or visit our
E-Service web site.
This will expedite necessary investigations and/or scheduling.
The Operations E-Service web site provides customers with
an online form to provide information to describe the problem
and submit a service request form directly to Public Works
Operations. An e-mail response will be sent within 15 minutes
to verify that your request has been received. The request
will be investigated by staff and the customer will then
receive a response reporting request status. Upon completion
of work, a final e-mail will report the completion date.
- Potholes are usually patched
with hot-mix asphalt. Other street condition problems are
addressed by a number of proven repair methods. Operations
works to locate the problem source in order to make complete
and permanent repairs, provided weather and conditions allow.
Public Works Operations determines need for street resurfacing
based on engineering considerations. Questions about resurfacing
should be directed to Public Works Operations at 918-3600.
- Operations schedules crews
according to current activities and available resources
at the time work is requested. A request will be scheduled
as manpower, materials, and equipment are available.
- Operations crews do not repair
traffic signals. Traffic signal malfunctions should be reported
to Traffic Engineering at 379-1800.
- Streets with curbs and gutters
are cleaned routinely with a street sweeping machine according
to schedule. Downtown streets are cleaned 3 nights per week,
major arterial and collector streets are cleaned once per
week, and subdivision and neighborhood streets with curbs
are cleaned once per month. Street sweeping schedules are
posted on the Government Access Channel - LRNN (cable channel
11).
- If you are not sure where
to direct your Public Works question, call our Service Request
Desk at 918-3600.
| For
More Information |
Eric Petty, P.E. - Division Manager
Operations Division
3313 J. E. Davis Drive, Little Rock, AR 72209
501-918-3600 | Fax: 501-918-3670 |
For
general service requests contact:
Service Request Desk at 501-918-3600 or try the
E-Service Website
|
Download
Free Acrobat PDF Reader - Opens in New Window |
|