DECEMBER 16, 2004
ITEM NO.: 7
FILE
NO.:
Z-6079-E
NAME:
Little Rock Christian Academy –
Conditional Use Permit
LOCATION:
19010 Cantrell Road
OWNER/APPLICANT:
Little Rock Christian Academy/The Wilcox Group
PROPOSAL:
A revision to a previously approved conditional use permit is requested
to allow for revision of the phasing plan and an increase in student population
and building square frontage for this existing private school.
1.
SITE LOCATION:
The school is located on the north side of Cantrell Road, between The
Ranch and Chenal Parkway.
2.
COMPATIBILITY WITH NEIGHBORHOOD:
The
campus is located in an area of mixed uses and zoning located along Cantrell
Road. The properties to the east contain a variety of uses
including residential, commercial and office.
Undeveloped tracts are located directly to the west and north.
The Cantrell/Chenal intersection is just west of the site.
This intersection includes a mixture of uses, including the new Walmart
Supercenter. A church and a
scattering of single family residences are located to the south.
The proposed revision should not affect the school’s continued
compatibility with the neighborhood.
All
owners of property located within 200 feet of the site, all residents within 300
feet who could be identified and the Aberdeen, and DuQuesne Neighborhood
Associations were notified of this request.
3.
ON SITE DRIVES AND PARKING:
At
total build-out, the school is to have 100 classrooms, housing 2,058 students. The break-down of classes by grades and the parking
requirement is as follows:
|
GRADES |
#
OF CLASSROOMS |
PARKING
SPACES REQUIRED |
|
|
|
|
|
ELEMENTARY
KINDERGARTEN |
12 (200
Students) |
20 |
|
1ST
GRADE |
7 |
7 |
|
2ND
GRADE |
7 |
7 |
|
3RD
GRADE |
7 |
7 |
|
4TH
GRADE |
7 |
7 |
|
5TH
GRADE |
7 |
7 |
|
6TH
GRADE |
7 |
7 |
|
MIDDLE
SCHOOL AND HIGH SCHOOL |
||
|
7TH
GRADE |
7 |
42 |
|
8TH
GRADE |
7 |
42 |
|
9TH
GRADE |
8 |
48 |
|
10TH
GRADE |
8 |
48 |
|
11TH
GRADE |
8 |
48 |
|
12TH
GRADE |
8 |
48 |
|
TOTAL
NUMBER OF CLASSROOMS |
100 |
338 |
|
|
|
|
|
The
school is proposed to have 220 employees (faculty).
One parking space is required for each teacher, employee and
administrator. Combining the 220 required faculty spaces with the 338
required classroom/student spaces results in a total parking requirement
of 558 |
||
The site currently has 218 paved parking spaces and 50 spaces in a temporary, gravel parking area; a total of 268 spaces. Phase I of this revision includes the construction of a new driveway off of Cantrell Road, providing additional stacking space for drop-off/pick-up. Phase III includes the construction of additional drives and 333 more paved parking spaces. Phases VI completes the parking with 120 more spaces. The plan proposes a total of 693 paved parking spaces and over a mile of driveways to provide stacking space. A traffic signal is proposed to be installed in conjunction with the Phase I drive.
4.
SCREENING AND BUFFERS:
Compliance
with the City’s Landscape and Buffer Ordinances and the Highway 10 Design
Overlay standards is required.
Interior
landscape islands must be at least 300 square feet in area to receive credit
toward fulfilling landscape ordinance requirements.
Unless
otherwise provided for, a six (6) foot high opaque screen, either a wooden fence
with its face side directed outward, a wall, or dense evergreen plantings, is
required along the northern, eastern and western perimeters of the site.
Landscaped
areas are required to be irrigated.
Prior
to a building permit being issued, it will be necessary to provide landscape
plans stamped with the seal of a Registered Landscape Architect.
5.
PUBLIC WORKS COMMENTS:
1.
A grading permit in accordance with Section 29-186(c)
and (d) will be required prior to any land clearing or grading activities at the
site. Site grading, and drainage
plans will need to be submitted and approved prior to the start of construction.
2.
Given the increased number of students and current
method of traffic control, a traffic signal should be provided to serve the
development. Coordinate design of
traffic signal with Traffic.
6.
UTILITY, FIRE DEPT. AND CATA COMMENTS:
Wastewater:
Sewer available, not adversely affected.
Entergy:
No Comments received.
CenterPoint
Energy: No Comments received.
Southwestern
Bell: No Comments received.
Water:
All Central Arkansas Water requirements in effect at the time of request
for water service must be met. The
facilities on-site will be private. When
meters are planned off private lines, private facilities shall be installed to
Central Arkansas Water’s material and construction specifications and
installation will be inspected by an engineer, licensed to practice in the State
of Arkansas. Execution of Customer
Owned Line Agreement is required.
A
Capital Investment Charge based on the size of connection(s) will apply to this
project in addition to normal charges. This
fee will apply to all meter connections including any metered connections off
the private fire system. Extension
of the fire line and additional fire hydrant(s) will be required.
Contact the Little Rock Fire Department to obtain information regarding
the required placement of the hydrant(s) and contact Central Arkansas Water
regarding procedures for installation of the hydrant(s).
This
development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate
pressure and fire protection.
Fire
Department: Approved as submitted.
County
Planning: Western portion of site
is outside of city limits. Development
must comply with Pulaski County Planning standards or annex to City of Little
Rock.
CATA:
The site is not located on a CATA bus route.
The Highway 10 express route does pass in front of the site.
SUBDIVISION
COMMITTEE COMMENT:
(NOVEMBER 11, 2004)
The applicant was
present. Staff presented the item and noted additional information was
needed regarding signage, fencing and building designs.
Staff asked the applicant to correct the parking design and scale shown
on the site plan and to add the Phase 6 parking to the phasing chart.
Staff noted the requested variances and deferrals related to sidewalks
and the interior drives and parking areas.
Public Works Comments
were noted. Staff voiced support
for deferring the Cantrell Road sidewalk until Phase 5 or future development on
adjacent properties. Staff stated a
traffic signal was needed on Cantrell Road.
The applicant’s engineer, Ernie Peters, stated he would coordinate the
signal location with Public Works. He
agreed that a signal was needed. Mr.
Peters stated the school was in agreement to install the signal, if AHTD would
allow it. Public Works staff stated
they would advocate the signal to AHTD.
Utility and Landscape
Comments were noted. It was noted
that the required screening on the perimeters would be dense evergreen plantings
rather than a wood fence. Staff
responded that it was acceptable to do the screening in that manner.
The applicant was advised
to respond to staff issues by November 17, 2004.
The Committee determined there were no other issues and forwarded the
item to the full Commission.
STAFF
ANALYSIS:
Little Rock Christian
Academy currently occupies a 50± acre tract of R-2 zoned property located at
19010 Cantrell Road. The west half
of the site is in an “island”, outside of the city limits.
On December 12, 1995, the
Planning Commission approved the first conditional use permit to allow the
school, then known as Walnut Valley Christian Academy, to build a new campus on
a 20-acre site. The school was
originally approved to have an enrollment of 1,040 students with a staff of 100.
On June 26, 1997, the
Commission approved a revision to the conditional use permit allowing for
expansion of the school onto an adjacent 10-acre tract.
Enrollment stayed at 1,040 and employee numbers increased to 110.
On September 3, 1998, the
Commission approved a second revision to the conditional use permit allowing for
a change in the phasing plan and an increase in enrollment to 1,100 students.
Employee numbers stayed at 110.
On May 11, 2000, the
Commission approved a third revision to the conditional use permit allowing for
the introduction of a new phase. The
site stayed at 30± acres and enrollment and employee numbers stayed at 1,100
and 110 respectively.
On January 9, 2003, the
Commission approved a fourth revision to the conditional use permit allowing for
expansion onto an adjacent 20-acre tract; resulting in a total of 50± acres. The revision allowed for expansion of the school and an
increase in student enrollment and employee numbers to 1,700 and 170
respectively. The plan included the
introduction of several new buildings, a track and practice field, a baseball
field and additional parking. Some
of the previously approved buildings were relocated under the new plan.
The school is now
proposing a revision to the C.U.P. allowing for a slight increase in student
population and building square footage. The
phases for future construction have been revised to accommodate the school’s
current and projected needs. The
student and faculty/staff numbers are now proposed as 2,058 and 220
respectively. The total building
square footage is proposed to increase from 264,924 square feet to 309,424
square feet. The baseball field has
been eliminated from the plan and the practice field and track have been
relocated from the front of the site to the rear.
There is some slight modification of the driveways and parking. The second driveway has been relocated farther from the west
property line and widened into more of a primary entrance.
A traffic signal will be installed at this entrance.
The existing building
summary and proposed phased construction plan are as follow:
|
EXISTING
BUILDINGS |
|
|
ELEMENTARY
BUILDING |
39,424
S.F. |
|
MIDDLE
SCHOOL BUILDING |
23,000 |
|
ACTIVITIES
BUILDING |
15,200 |
|
GYM |
20,000 |
|
ADMIN |
2,900 |
|
MULTIPURPOSE
BUILDING |
15,500
S.F. |
|
|
|
|
FUTURE
BUILDINGS |
|
|
PHASE
1 |
|
|
ATHLETIC
TRAINING |
7,000
S.F. |
|
SCIENCE
BUILDING |
15,000
S.F. |
|
|
|
|
PHASE
2 |
|
|
DROP-OFF/PICK-UP
MODIFICATIONS |
|
|
CANOPY/PAVILION
SYSTEM |
|
|
|
|
|
PHASE
3 |
|
|
PRACTICE
FIELD AND TRACK |
|
|
PARKING |
|
|
ADMINISTRATION
BLDG. ADDITION |
1,400
S.F. |
|
|
|
|
PHASE
4 |
|
|
HIGH
SCHOOL CLASSROOM ADDITIONS |
20,000
S.F. |
|
|
|
|
PHASE
5 |
|
|
HIGH
SCHOOL ADDITIONS |
55,000
S.F. |
|
|
|
|
PHASE
6 |
|
|
GYMNASIUM |
35,000
S.F. |
|
ADDITIONAL
PARKING AND DRIVES |
|
|
|
|
|
PHASE
7 |
|
|
AUDITORIUM |
45,000
S.F. |
|
|
|
|
PHASE
8 |
|
|
KINDERGARTEN
BUILDING |
15,000
S.F. |
|
|
|
|
TOTAL
CAMPUS AREA |
309,424
S.F. |
The proposed break-down
of classrooms by grade is as follows:
|
EARLY
CHILDHOOD |
#
OF CLASSES
X |
STUDENTS PER
CLASS |
#
OF STUDENTS |
|
KINDERGARTEN
– 4 yr old |
5
X |
15 |
75 |
|
KINDERGARTEN
– 5 yr old |
7
X |
18 |
125 |
|
1ST
GRADE |
7
X |
20 |
140 |
|
|
|
|
|
|
ELEMENTARY |
|
|
|
|
2ND
GRADE |
7
X |
22 |
154 |
|
3RD
GRADE |
7
X |
22 |
154 |
|
4TH
GRADE |
7
X |
22 |
154 |
|
5TH
GRADE |
7
X |
22 |
154 |
|
|
|
|
|
|
MIDDLE
SCHOOL |
|
|
|
|
6TH
GRADE |
7
X |
22 |
154 |
|
7TH
GRADE |
7
X |
22 |
154 |
|
8TH
GRADE |
7
X |
22 |
154 |
|
|
|
|
|
|
HIGH
SCHOOL |
|
|
|
|
9TH
GRADE |
8
X |
20 |
160 |
|
10TH
GRADE |
8
X |
20 |
160 |
|
11TH
GRADE |
8
X |
20 |
160 |
|
12TH
GRADE |
8
X |
20 |
160 |
|
|
|
|
|
|
|
|
|
2058
– TOTAL STUDENTS |
|
|
|
|
220
– TOTAL FACULTY/STAFF |
The school is proposing
to maintain the one existing monument sign and will not request additional
ground-signs on Cantrell Road. Currently,
the school does not have building signage.
If they decide to add additional signage on the buildings, it will be
limited to a single wall sign per building which complies with the sign
ordinance. The Phase I building
construction will closely resemble the school’s current design, consisting of
a combination of metal siding and white masonry veneer with sloping silver metal
roofs. Future phases will likely
use more masonry veneer and less metal siding while maintaining the use of
sloping metal roofs.
The school is requesting,
and staff is supporting, a deferral of sidewalk construction on Cantrell Road
until Phase V or development of adjacent properties.
The school is also requesting and staff is supporting, deferral of curb
and gutter along the Phase I driveway and use of a gravel parking lot until
Phase III. Under Phase III, the
practice field is moved to its permanent location as shown on the master plan
and the permanent paved parking can be completed.
The west half of the
property is not in the city limits. It
is an “island” surrounded by the corporate limits.
Staff believes it is appropriate to require annexation of this portion of
the school campus. As it is, there
will be confusion for emergency service providers.
It is not beneficial to the school to have half of its campus in the city
and half out.
Based on the City’s
current sewer policy, since the site is contiguous to the city limits, the site
must be annexed in order to obtain sewer service.
Other than for the
annexation issue, to staff’s knowledge, there are no outstanding issues.
On November 17, the applicant submitted responses to issues raised at
Subdivision Committee and reflected in the analysis above.
There is no bill of assurance for this property.
STAFF
RECOMMENDATION:
Staff recommends approval
of the requested revised C.U.P. subject to compliance with the following
conditions:
1.
Compliance with the staff comments and conditions
outlined in Sections 4, 5 and 6 of the staff report; including installation of a
traffic signal on Cantrell Road in conjunction with the Phase I driveway.
2.
The portion of the school campus that is currently
not in the city limits must be annexed prior to Phase I being constructed.
Staff
recommends approval of the requested deferral of sidewalk construction on
Cantrell Road until Phase V or development of adjacent properties, whichever
occurs first.
Staff
recommends approval of the requested deferral of curb and gutter along the Phase
I driveway and use of a gravel parking lot until Phase III.