Online Services | Privacy | Accessibility | Security

 

DECEMBER 16, 2004

 

ITEM NO.:                              7                                                                                

 

FILE NO.:                               Z-6079-E

 

NAME:                                    Little Rock Christian Academy –
Conditional Use Permit

                                               

LOCATION:                           19010 Cantrell Road

                                               

OWNER/APPLICANT:         Little Rock Christian Academy/The Wilcox Group

                                               

PROPOSAL:                         A revision to a previously approved conditional use permit is requested to allow for revision of the phasing plan and an increase in student population and building square frontage for this existing private school.

 

1.        SITE LOCATION:

 

            The school is located on the north side of Cantrell Road, between The Ranch and Chenal Parkway.

 

2.        COMPATIBILITY WITH NEIGHBORHOOD:

 

The campus is located in an area of mixed uses and zoning located along Cantrell Road.  The properties to the east contain a variety of uses including residential, commercial and office.  Undeveloped tracts are located directly to the west and north.  The Cantrell/Chenal intersection is just west of the site.  This intersection includes a mixture of uses, including the new Walmart Supercenter.  A church and a scattering of single family residences are located to the south.  The proposed revision should not affect the school’s continued compatibility with the neighborhood.

 

All owners of property located within 200 feet of the site, all residents within 300 feet who could be identified and the Aberdeen, and DuQuesne Neighborhood Associations were notified of this request.

 

3.         ON SITE DRIVES AND PARKING:

 

At total build-out, the school is to have 100 classrooms, housing 2,058 students.  The break-down of classes by grades and the parking requirement is as follows:


 

GRADES

# OF CLASSROOMS

PARKING SPACES REQUIRED

 

 

 

ELEMENTARY

   KINDERGARTEN

 

12

(200 Students)

 

 

20

1ST GRADE

7

7

2ND GRADE

7

7

3RD GRADE

7

7

4TH GRADE

7

7

5TH GRADE

7

7

6TH GRADE

7

7

 

 

MIDDLE SCHOOL

   AND HIGH SCHOOL

 

7TH GRADE

7

42

8TH GRADE

7

42

9TH GRADE

8

48

10TH GRADE

8

48

11TH GRADE

8

48

12TH GRADE

8

48

 

 

TOTAL NUMBER OF CLASSROOMS

 

100

 

338

 

 

 

The school is proposed to have 220 employees (faculty).  One parking space is required for each teacher, employee and administrator.  Combining the 220 required faculty spaces with the 338 required classroom/student spaces results in a total parking requirement of 558
on-site parking spaces.

 

 

 

The site currently has 218 paved parking spaces and 50 spaces in a temporary, gravel parking area; a total of 268 spaces.   Phase I of this revision includes the construction of a new driveway off of Cantrell Road, providing additional stacking space for drop-off/pick-up.  Phase III includes the construction of additional drives and 333 more paved parking spaces.  Phases VI completes the parking with 120 more spaces.  The plan proposes a total of 693 paved parking spaces and over a mile of driveways to provide stacking space.  A traffic signal is proposed to be installed in conjunction with the Phase I drive.

 

4.         SCREENING AND BUFFERS:

 

Compliance with the City’s Landscape and Buffer Ordinances and the Highway 10 Design Overlay standards is required.

 

Interior landscape islands must be at least 300 square feet in area to receive credit toward fulfilling landscape ordinance requirements.

 

Unless otherwise provided for, a six (6) foot high opaque screen, either a wooden fence with its face side directed outward, a wall, or dense evergreen plantings, is required along the northern, eastern and western perimeters of the site.

 

Landscaped areas are required to be irrigated.

 

Prior to a building permit being issued, it will be necessary to provide landscape plans stamped with the seal of a Registered Landscape Architect.

 

5.         PUBLIC WORKS COMMENTS:

 

1.      A grading permit in accordance with Section 29-186(c) and (d) will be required prior to any land clearing or grading activities at the site.  Site grading, and drainage plans will need to be submitted and approved prior to the start of construction.

2.      Given the increased number of students and current method of traffic control, a traffic signal should be provided to serve the development.  Coordinate design of traffic signal with Traffic.

 

6.         UTILITY, FIRE DEPT. AND CATA COMMENTS:

 

Wastewater:  Sewer available, not adversely affected.

 

Entergy:  No Comments received.

 

CenterPoint Energy:   No Comments received.

 

Southwestern Bell:  No Comments received.

 

Water:  All Central Arkansas Water requirements in effect at the time of request for water service must be met.  The facilities on-site will be private.  When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water’s material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas.  Execution of Customer Owned Line Agreement is required.

 

A Capital Investment Charge based on the size of connection(s) will apply to this project in addition to normal charges.  This fee will apply to all meter connections including any metered connections off the private fire system.  Extension of the fire line and additional fire hydrant(s) will be required.  Contact the Little Rock Fire Department to obtain information regarding the required placement of the hydrant(s) and contact Central Arkansas Water regarding procedures for installation of the hydrant(s).

 

This development will have minor impact on the existing water distribution system.  Proposed water facilities will be sized to provide adequate pressure and fire protection.

 

Fire Department:  Approved as submitted.

 

County Planning:  Western portion of site is outside of city limits.  Development must comply with Pulaski County Planning standards or annex to City of Little Rock.

 

CATA:  The site is not located on a CATA bus route.  The Highway 10 express route does pass in front of the site.

 

 

SUBDIVISION COMMITTEE COMMENT:                         (NOVEMBER 11, 2004)

 

The applicant was present.  Staff presented the item and noted additional information was needed regarding signage, fencing and building designs.  Staff asked the applicant to correct the parking design and scale shown on the site plan and to add the Phase 6 parking to the phasing chart.  Staff noted the requested variances and deferrals related to sidewalks and the interior drives and parking areas.

 

Public Works Comments were noted.  Staff voiced support for deferring the Cantrell Road sidewalk until Phase 5 or future development on adjacent properties.  Staff stated a traffic signal was needed on Cantrell Road.  The applicant’s engineer, Ernie Peters, stated he would coordinate the signal location with Public Works.  He agreed that a signal was needed.  Mr. Peters stated the school was in agreement to install the signal, if AHTD would allow it.  Public Works staff stated they would advocate the signal to AHTD.

 

Utility and Landscape Comments were noted.  It was noted that the required screening on the perimeters would be dense evergreen plantings rather than a wood fence.  Staff responded that it was acceptable to do the screening in that manner.

 

The applicant was advised to respond to staff issues by November 17, 2004.  The Committee determined there were no other issues and forwarded the item to the full Commission.

 

 

STAFF ANALYSIS:

 

Little Rock Christian Academy currently occupies a 50± acre tract of R-2 zoned property located at 19010 Cantrell Road.  The west half of the site is in an “island”, outside of the city limits.

 

On December 12, 1995, the Planning Commission approved the first conditional use permit to allow the school, then known as Walnut Valley Christian Academy, to build a new campus on a 20-acre site.  The school was originally approved to have an enrollment of 1,040 students with a staff of 100.

 

On June 26, 1997, the Commission approved a revision to the conditional use permit allowing for expansion of the school onto an adjacent 10-acre tract.  Enrollment stayed at 1,040 and employee numbers increased to 110.

 

On September 3, 1998, the Commission approved a second revision to the conditional use permit allowing for a change in the phasing plan and an increase in enrollment to 1,100 students.  Employee numbers stayed at 110.

 

On May 11, 2000, the Commission approved a third revision to the conditional use permit allowing for the introduction of a new phase.  The site stayed at 30± acres and enrollment and employee numbers stayed at 1,100 and 110 respectively.

 

On January 9, 2003, the Commission approved a fourth revision to the conditional use permit allowing for expansion onto an adjacent 20-acre tract; resulting in a total of 50± acres.  The revision allowed for expansion of the school and an increase in student enrollment and employee numbers to 1,700 and 170 respectively.  The plan included the introduction of several new buildings, a track and practice field, a baseball field and additional parking.  Some of the previously approved buildings were relocated under the new plan.

 

The school is now proposing a revision to the C.U.P. allowing for a slight increase in student population and building square footage.  The phases for future construction have been revised to accommodate the school’s current and projected needs.  The student and faculty/staff numbers are now proposed as 2,058 and 220 respectively.  The total building square footage is proposed to increase from 264,924 square feet to 309,424 square feet.  The baseball field has been eliminated from the plan and the practice field and track have been relocated from the front of the site to the rear.  There is some slight modification of the driveways and parking.  The second driveway has been relocated farther from the west property line and widened into more of a primary entrance.  A traffic signal will be installed at this entrance.

 

The existing building summary and proposed phased construction plan are as follow:

 

 

EXISTING BUILDINGS

 

 

ELEMENTARY BUILDING

39,424 S.F.

MIDDLE SCHOOL BUILDING

23,000

ACTIVITIES BUILDING

15,200

GYM

20,000

ADMIN

2,900

MULTIPURPOSE BUILDING

15,500 S.F.

 

 

FUTURE BUILDINGS

 

 

PHASE 1

 

ATHLETIC TRAINING

7,000 S.F.

SCIENCE BUILDING

15,000 S.F.

 

 

PHASE 2

 

DROP-OFF/PICK-UP MODIFICATIONS

 

CANOPY/PAVILION SYSTEM

 

 

 

PHASE 3

 

PRACTICE FIELD AND TRACK

 

PARKING

 

ADMINISTRATION BLDG. ADDITION

1,400 S.F.

 

 

PHASE 4

 

HIGH SCHOOL CLASSROOM ADDITIONS

20,000 S.F.

 

 

PHASE 5

 

HIGH SCHOOL ADDITIONS

55,000 S.F.

 

 

PHASE 6

 

GYMNASIUM

35,000 S.F.

ADDITIONAL PARKING AND DRIVES

 

 

 

PHASE 7

 

AUDITORIUM

45,000 S.F.

 

 

PHASE 8

 

KINDERGARTEN BUILDING

15,000 S.F.

 

 

TOTAL CAMPUS AREA

309,424 S.F.

 

 

The proposed break-down of classrooms by grade is as follows:

 

EARLY CHILDHOOD

  

# OF     

CLASSES X

 

STUDENTS

PER

CLASS

# OF STUDENTS

KINDERGARTEN – 4 yr old

5 X

15

75

KINDERGARTEN – 5 yr old

7 X

18

125

1ST GRADE

7 X

20

140

 

 

 

 

ELEMENTARY

 

 

 

2ND GRADE

7 X

22

154

3RD GRADE

7 X

22

154

4TH GRADE

7 X

22

154

5TH GRADE

7 X

22

154

 

 

 

 

MIDDLE SCHOOL

 

 

 

6TH GRADE

7 X

22

154

7TH GRADE

7 X

22

154

8TH GRADE

7 X

22

154

 

 

 

 

HIGH SCHOOL

 

 

 

9TH GRADE

8 X

20

160

10TH GRADE

8 X

20

160

11TH GRADE

8 X

20

160

12TH GRADE

8 X

20

160

 

 

 

 

 

 

 

2058 – TOTAL STUDENTS

 

 

 

 220  – TOTAL FACULTY/STAFF

 

 

The school is proposing to maintain the one existing monument sign and will not request additional ground-signs on Cantrell Road.  Currently, the school does not have building signage.  If they decide to add additional signage on the buildings, it will be limited to a single wall sign per building which complies with the sign ordinance.  The Phase I building construction will closely resemble the school’s current design, consisting of a combination of metal siding and white masonry veneer with sloping silver metal roofs.  Future phases will likely use more masonry veneer and less metal siding while maintaining the use of sloping metal roofs.

 

The school is requesting, and staff is supporting, a deferral of sidewalk construction on Cantrell Road until Phase V or development of adjacent properties.  The school is also requesting and staff is supporting, deferral of curb and gutter along the Phase I driveway and use of a gravel parking lot until Phase III.  Under Phase III, the practice field is moved to its permanent location as shown on the master plan and the permanent paved parking can be completed.

 

The west half of the property is not in the city limits.  It is an “island” surrounded by the corporate limits.  Staff believes it is appropriate to require annexation of this portion of the school campus.  As it is, there will be confusion for emergency service providers.  It is not beneficial to the school to have half of its campus in the city and half out.

 

Based on the City’s current sewer policy, since the site is contiguous to the city limits, the site must be annexed in order to obtain sewer service.

 

Other than for the annexation issue, to staff’s knowledge, there are no outstanding issues.  On November 17, the applicant submitted responses to issues raised at Subdivision Committee and reflected in the analysis above.  There is no bill of assurance for this property.

 

STAFF RECOMMENDATION:

 

Staff recommends approval of the requested revised C.U.P. subject to compliance with the following conditions:

 

1.      Compliance with the staff comments and conditions outlined in Sections 4, 5 and 6 of the staff report; including installation of a traffic signal on Cantrell Road in conjunction with the Phase I driveway.

 

2.      The portion of the school campus that is currently not in the city limits must be annexed prior to Phase I being constructed.

 

Staff recommends approval of the requested deferral of sidewalk construction on Cantrell Road until Phase V or development of adjacent properties, whichever occurs first.

 

Staff recommends approval of the requested deferral of curb and gutter along the Phase I driveway and use of a gravel parking lot until Phase III.